Build-up
The Microne build-up on floor and wall, step by step: substrate, primer, coats, sanding and drying times.
Step by step.
Microne is applied with two base coats and two finish coats. Choose floor or wall, and point to a step to see where the layer sits.
Floor
24 hours from the last coat to varnish
Wall
24 hours from the last coat to varnish
Up to 3 mm of microcement: 1 + 1 + 0.5 + 0.5.
Source: Cemher's technical data sheet for Microne and Microne Plus.
Substrate and preparation.
What the data sheet requires of the surface before the first coat.
| The substrate | Flat and firm. If not, Compactec is used first. |
|---|---|
| Clean and dry | Free of dust, grease, soap and loose paint. |
| Substrates the data sheet mentions | Concrete, cement mortar, ceramics, gypsum and plasterboard. |
| Old tiles | Can be covered. The joints are filled with joint filler, which dries for at least 24 hours before primer. |
| Primer | Always Primer 100, on absorbent and non-absorbent substrates. One coat. |
Conditions and technique.
Drying times, thicknesses and sanding, as stated in the data sheet.
| Minimum application temperature | + 10 °C |
|---|---|
| Between coats | 4 to 8 hours. The previous coat must be dry before the next is applied. Not wet-on-wet. |
| Thickness | Do not apply thick layers. Base max 1 mm per coat, finish max 0.5 mm. |
| Sanding | Base is sanded with 40 grit after each coat. Finish is sanded lightly with a random orbital sander, 120 to 220 grit. |
| Before varnish | 24 hours from the last coat. The moisture in the coating must be below 5 %, measured with an instrument. |
| Tools | Metal trowel. Wash with water immediately after use. |